Steel King

Steel King’s New London location completed an expansion, nearly doubling its manufacturing facility to increase production of its SK2000 steel frame and beam system, that is used heavily as the basis for traditional storage and multi-level order picking systems nationwide.

Project Features:

  • 135,000 SF Pre-engineered metal building plant expansion

  • Manufacturing & warehousing

  • Robotic welders

  • Powder coating room

Becca Meeuwsen